感谢信

英文职业感谢信

时间:2022-11-12 18:24:52 感谢信 我要投稿

【精华】英文职业感谢信3篇

  随着感恩思想的积极提倡,我们都可能会用到感谢信,写感谢信的时候要注意感谢内容的完整。那么,感谢信需要写哪些内容呢?以下是小编为大家收集的英文职业感谢信3篇,欢迎阅读与收藏。

【精华】英文职业感谢信3篇

英文职业感谢信 篇1

* * * * company:

  I have a golden age in ** ** *, and now my baby is full moon. This is a time when my children and I are healthy and our children are thriving and the whole family is very happy. All of this thanks to sister sunshine who gave us a very good wife. She is a very good character, love to say, smile, warm and sincere, optimistic and cheerful teacher, I and the object all affectionately call her zhang jie. Zhang Jie with the love of her work, skilled nursery technology, hard meticulous and warm and thoughtful service, to ensure the children healthy and happy and I spent confined, this for our future life and the baby's healthy growth and laid a good foundation. Here we offer our sincere thanks to sister zhang.

  Zhang is very passionate about the job. With my responsibility and love for my work, zhang has been able to arrive at home in advance, no matter what the weather is. Sometimes I am still asleep, and zhang is already there. Although it was said that the contract agreed to work only eight hours per day, zhang could provide us with at least nine hours of enthusiastic service every day, which made us very moved.

  Zhang jie is professional, meticulous and comprehensive. Although the work content of the month of the wife is very complicated, zhang jie can be very skilled at the ease of each work. In daily work, she not only fed the baby, change diapers, bathe, according to touch my limbs, had to take care of me, for I wash his clothes, and cooking and massage etc, a lot of work, but she still do every job in an orderly way. Zhang is a hard-working and diligent worker, with a constant variety of daily lunches and scientific nutrition. Time to wipe the floor, let the house spotless, create a comfortable environment for us. In particular, zhang is very diligent and thrifty in her work. She makes reasonable use of resources, never wastes anything, and makes a good example for us.

  For a short month, zhang has become our friend, our teacher. I still feel lucky to be able to meet such an excellent monthly sister-in-law. On behalf of my husband, on behalf of my healthy and lovely daughter, I would like to express my sincere thanks to zhang. I sincerely hope that she can work well and be happy! Finally, thanks again for the warm service that sister sunshine has provided for us. Wish the company a prosperous and prosperous future!

英文职业感谢信 篇2

  "We common people thank you very much for the communist party, thanks to the electric power enterprise, what is a" positive energy ", this is the "positive energy", we further deep mountains, families are self-provided power shaft, no electricity, we could not survive, let alone life ". On May 28, jinzhou city tower ditch villagers representatives Zhang Weiji Zhong Tun township building, jinzhou city beiputuo mountain scenic area management office deputy director of the side line of six people, such as liu wei will pennants and a piece of red paper letters into the hands of taihe district power supply branch leadership, while the excited said thank you.

  Beiputuo mountain scenic spot to daxing ditch village, rolling mountains, lush trees, the line was built in the 1960 s, due to the old, the wire already aging, the wind in the rain often power outages, and easy to cause fire, the villagers' life is affected by a lot, because history and funds, has not been solved.

  At the beginning of the year, in order to solve this problem, we ensured the safe and stable electricity consumption of the national scenic spots and users of daxing valley village. The branch has promoted the hidden trouble of the line in this area to the hidden danger of urgent solution. The branch has opened the "green channel" in accordance with the principle of "special operation", and has overcome many difficulties and challenges. We will convene a meeting of leading groups to study and solve and formulate reform plans. In order to ensure the smooth transformation of the line, on January 12, branch manager to lead relevant personnel to the scene of the circuit transformation and the scenic area leadership and village cadres field office, field survey, on-site coordination design on the line, along the direction of the ground environment, cross across conditions, transport equipment and construction process of rock excavation, above the permafrost, stud, such as difficulty and the safe hidden trouble, make exploration and analysis of the field, to develop a detailed security risk prevention and control plan, organization, technology, safety measures, for the engineering safety, high quality completion laid a solid foundation. Branch in order to ensure construction safety, asked the more workers in the construction of the environment, the difficulty is to strictly implement the work plan, strictly implement standardized operation process, strictly implement the "two ticket SanZhi", put an end to no ticket assignments, illegal behavior, put an end to "ten kinds of typical chronic violate the rules", strictly implement various warning signs and fence line, and have people care, to prevent the visitors enter the construction area. The staff of the branch in the construction of the freezing cold, the rock, the frozen earth excavation

  Difficult, winding mountain roads rugged difficult difficulties such as, in some places a large construction vehicle can't will be transported to the construction site equipment, staff with the original method, human lifting equipment, carry instruments to hike up the mountain. Although construction environment is bad, but it didn't cut their strict standard of engineering quality, ensure the quality of line and ensure the safety of the renovation construction, ensure the security of the state-level scenic spot area and the villagers to use electricity, electricity, light electricity at ease.

  It is understood that the newly installed 250 kva transformer 3, in the new high voltage electric pole, 42 new building insulation wire 1760 meters, the new cable laying of 1870 meters, the newly installed switch 3, demolition of high voltage overhead line 20 base, reconstruction of low voltage electrical area 1.

  With a steady stream of electricity flowing over the mountains, the once closed mountain trenches lit up the light of hope, and the villagers realized the change from "access to electricity" to "good use of electricity". "Line, before modification is often not the light electricity, TV audio image, home appliances has become a decoration, some family refrigerator as cupboard, now good, full of power appliances follow one's inclinations to what is what, we don't have to worry about when it rains and windy power". The representative of the village of daxing was speaking in his heart.

  The line has been successfully modified, and the staff of the branch has brought convenience to the villagers and reduced the occurrence of fire accidents in the scenic area. A banner and a thank-you note are both positive for the company's practice of "you use electricity, I work hard", and praise for the social benefits of the company's work.

英文职业感谢信 篇3

Gezhouba electric power co., LTD.

  On September 15, 20 * * on the official start of the construction of substation construction, civil engineering and mechanical and electrical projects fully opened, on the occasion of the arrival of the Spring Festival, all the staff of our company to a few months to fight hard in mar hydropower station my heartfelt thanks to the builders of a line, I wish you good health and smooth work, family happiness, all the best!

  20 * * years, your company contract to build the right bank of the transformer substation construction faces many difficulties, because the substation starts late, plant is located in the plateau caused by personnel equipment down effect, these difficulties are under your company's unremitting efforts and hard work were overcome one by one; November 20 * * soon has entered the winter construction, employees tend to be far from home, in the work bears hardships and stands hard work, overcome the poor construction conditions, weather, time and heavy task of construction difficulties, such as your company together take the bull by the horns, and on the right bank substation finished smoothly. This several months of continuous efforts, through your company in the past few months under the efforts of your company has basically completed the construction of transformer substation construction project goal and electromechanical equipment present goal, and implement the mar in hydropower station of "zero accident, zero harm" security management goal, for hydropower station safety management has accumulated rich experience. The achievement of these achievements and your company's support and efforts are indivisible. 20xx year will be a year of heavy tasks, and I hope your company will continue to carry forward the spirit of "self-improvement and courage to surpass", and ensure that 20xx is on April 15

  The right bank construction substation has the target of electric running.

  May the future work well with you.

【英文职业感谢信】相关文章:

英文职业感谢信六篇06-01

英文职业感谢信三篇06-10

【实用】英文职业感谢信10篇11-22

实用的英文职业感谢信四篇09-01

关于英文职业感谢信4篇07-10

英文职业感谢信汇总9篇07-12

英文职业感谢信汇编八篇06-16

英文职业感谢信汇编五篇06-17

【精华】英文职业感谢信四篇06-20

英文职业感谢信集锦8篇06-20